Tag: BTS4000 operation tips

17
Mar

Export test data to Excel format

NDA(Neware data analysis) is the default format file which generated by Neware testers, while some customers would like their data to be xls or plaint txt format. Today we are going to talk about xls(excel) format data generation in Neware BTSDA. Firstly, i would like to introduce six excel report formats to you.Visible report: The exported data is the data

Read more

15
Mar

Clear mark

For the channel under “protected, stopped,paused” status, we can use “clear mark”to change them into “finished” status. Select the channel you want to change, right click, simply click”Clear mark”, as a result, it’s status will be finished. If you have more questions, please contact me with: collin@newarebattery.com

12
Mar

Step modify

Data and working steps can be modified during the test via “step modify”. Select the channel you’d like to modify, right click, simply click “Step Modify”. Now, you can reset the working steps and data in reset step interface.

22
Dec

How to find out the mid machine and tester ID

Sometime when you have trouble in using Neware BTS, the technicans from Neware may ask you the mid machine or the tester device ID, do you know how to find out the mid machine and tester ID from Neware BTS software? Please follow the following step, it’s very easy. Above is the mid machine ID and tester ID for BTS3000(network edition)

Read more

16
Dec

Careful using 0.1s or 1s data sampling interval for battery life cycle tests

For Neware BTS4000 client software, the default sampling time interval is 0.1s, which means the testing data will be recorded 10 times each second. For short time test, this default setting is good, cause more data more helpful for you to get more information of the batteries, right? But for long time battery tests, such as for battery life-cycle tests, this

Read more

14
Dec

How to set up high frequency test script correctly?

For some customer, they’d like to use BTS4000 for high frequency(such as 500ms), so they’d set up a testing script likes the following picture: But when looking at the testing result, the data is not correct, please refer to the following picture, the current is very small or even 0. That’s strange, right? So if you want to use regular testing

Read more

11
Dec

How to migrate BTS database to a new computer

For some customers, they’d like to keep all the BTS testing history data in their computers, but as time goes by, the data size becomes larger and larger, in this situation, they want to migrate the BTS database to a newer and better computer. How to make that happen? And if there are testing going on all the testers, could

Read more

1
Dec

Change views in BTS software client

By clicking the buttons in the following pictures, you can switch different views in Neware BTS software client.

1
Dec

Operate BTS channels in a batch

Some customers asked us how to operate BTS channels together, such as how to start up tests together and how to export data all together. In fact, it’s easy. Please refer to the following pictures. Step 1: In the main working area, you can use CTRl+A to select all the channels, or you can press the CTRL and click the

Read more

9
Oct

how to set up CVC test without current end condition?

For regular battery constant current charge tests,when you use constant voltage to charge the battery, the current flows into the battery becomes smaller and smaller as time goes by, right?There must be a point for you to stop the charge, the end condition of that point is supposed to be a very small current.That’s why for CV_Chg the end condition

Read more