Tag: BTS4000 software operation

12
Mar

Check real- time data

Real-time data can be checked during test process!! Select the channel you want to check; right click, simply choose view data. If you have more questions, please contact me with: collin@newarebattery.com

8
Mar

Battery capacity test for Lithium-ion battery

Battery capacity test is one of functions for Neware battery testing equipment. All of models can support this function include BTS 3000,BTS 4000,BTS 5000, BTS 8000, BTS 9000, IGBT….. Sample test: Battery model and specification: Li-ion 18650,  2000mA,   3.7V How dose the battery capacity test work? 1 Fully recharge battery until it reached it’s rated voltage(normally 4.2V); Set up cut-off

Read more

8
Mar

Testing channel completed/paused status

There are 3 status (stopped,finished,protected) indicate that testing channels are completed or paused. You can view the previous testing status, every time you connect the tester to the server. Finished: Working step have been completed. Stopped: Working step haven’t completed, testing channel is paused. Protected: It have reached some of protection conditions(Eg Voltage limitation…), channel is paused to protect the

Read more

4
Mar

Channel transfer

“Channel transfer” can transfer working steps and data from one channel to another one. The aim of channel transfer is to avoid single channel to be terminated accidentally caused by physical damage。 1 Select 2 channels(one testing channel and one unused channel) 2 Right click, click “Move”,then the channel been transferred will indicate “Stopped”. If you have more questions, please

Read more

1
Mar

Channel lock

It’s a quick guide you how to” lock channel” on BTS platform. After click “Channel Lock”, there will be a pop up window to indicate all the channels lock state:0-Unlocked, 1-locked The locked channel will only display “Locked” status under small icon setting. Channels can only be locked under unused or finished state, if channels are under other states, there will

Read more

1
Dec

Change views in BTS software client

By clicking the buttons in the following pictures, you can switch different views in Neware BTS software client.

1
Dec

Operate BTS channels in a batch

Some customers asked us how to operate BTS channels together, such as how to start up tests together and how to export data all together. In fact, it’s easy. Please refer to the following pictures. Step 1: In the main working area, you can use CTRl+A to select all the channels, or you can press the CTRL and click the

Read more

13
Nov

how to set up different record interval for each step?

This is a question from one of our BTS4000 customers. We found it very useful in our development to run a pulse charging regime. For example we loop 54 seconds of CCCV followed by 6 seconds of Rest. (The CCCV contains the exit condition) The functionality of the BTS4000 allows to do it. However- It collects too many records (two

Read more

9
Oct

how to set up CVC test without current end condition?

For regular battery constant current charge tests,when you use constant voltage to charge the battery, the current flows into the battery becomes smaller and smaller as time goes by, right?There must be a point for you to stop the charge, the end condition of that point is supposed to be a very small current.That’s why for CV_Chg the end condition

Read more