Software and hardware operation and tips

8
Mar

Testing channel completed/paused status

There are 3 status (stopped,finished,protected) indicate that testing channels are completed or paused. You can view the previous testing status, every time you connect the tester to the server. Finished: Working step have been completed. Stopped: Working step haven’t completed, testing channel is paused. Protected: It have reached some of protection conditions(Eg Voltage limitation…), channel is paused to protect the

Read more

4
Mar

Record, protection condition setting instructions

1.Start Step ID: Choose ID position where the first step begins 2. Record Condition: Multiple choices; The test satisfy any condition whatever time, voltage or current, the data is recorded once. This means the relationship between the record conditions is “logical OR”. Please select the record conditions reasonable and meaningful, if the interval is set too small, the data file will be large.

Read more

4
Mar

Channel transfer

“Channel transfer” can transfer working steps and data from one channel to another one. The aim of channel transfer is to avoid single channel to be terminated accidentally caused by physical damage。 1 Select 2 channels(one testing channel and one unused channel) 2 Right click, click “Move”,then the channel been transferred will indicate “Stopped”. If you have more questions, please

Read more

2
Mar

History Data

Select Server IP and middle machine model first, and then click the “History Data”. 2. On the “History Data” interface, select “Research”, and then we can see all information of this middle machine of this Server. 3. All history data of this middle machine will be ordered based on the starting time, select the serial number, the interface on the

Read more

2
Mar

Single Start

Select the channel to be operated, right-click and select “Single Start”. On the “start” interface, we can set the working step, record condition, and protect condition. Click OK, the channel will start working. *Note: The “start” interface contains “Standard Settings” and “Professional Settings”. “Standard Settings” : set the working step as a whole. “Professional Settings” : every single working step

Read more

2
Mar

Single Stop

If we want to reset, stop or pause the working steps of one or more chanles, we need to “Single Stop”. Right-click and select “Single Stop” on the channel that you want to set. As you can see, the working channel has been stopped.

2
Mar

Unit Setting

Neware BTS software provides users a very simple and flexible way to set their needed units according to different testing requirements . Right-click the interface on the software, and select “Unit Setting”. We can set: Volt. (V/mA), Cur. (A/mA/μA), Cap. (Ah/mAh), Temp. (°C/°F), R. (Ω/mΩ), Power Unit (W/mW), Time Unit (sec/msec), Eng Unit (Wh/mWh), Pressure Unit (KPa/Pa), Step Edit Time

Read more

2
Mar

List View

How to show the real-time information of the channels by displaying “List View”? Click “List View”, the middle choice in the bottom list of options on the BTS software. Select the data what you want to copy, and right click the interface to copy the data to Excel or other documents.

1
Mar

Channel lock

It’s a quick guide you how to” lock channel” on BTS platform. After click “Channel Lock”, there will be a pop up window to indicate all the channels lock state:0-Unlocked, 1-locked The locked channel will only display “Locked” status under small icon setting. Channels can only be locked under unused or finished state, if channels are under other states, there will

Read more

26
Feb

Reset Map

“Reset map” which means using the software to reflect the channels of the machine. How to reset map? 1.Right click on the software interface. Select “Reset Map” 2. Right click on the interface of “Set Mapping”. Select “Clear All” to delete reflecting channels which were set before on the software. 3. Right click on the interface, and select “Main/Aux channel

Read more