NEWARE Official Guide: How to Start Using NEWARE Battery Testing System

Latest Update Date: Nov 18, 2026
Editor: Chris Chen, Shaochong Zhao

This guide helps first-time users set up and begin operating NEWARE BTS4000, BTS6000, BTS8000, and AIO battery test systems. It explains how the system components work together, how to connect the hardware, and how to install the BTS Client and BTS Server software.

The guide is organized into three sections.

  1. System Architecture — Identify the main hardware and software components and understand how they communicate.
  2. Hardware Connection — Follow the connection instructions for your battery test system.
  3. Software Installation, Setup and Connection — Install the BTS software and connect the tester to the software for initial operation.
  4. BTS client user guide — Basic user guide

1. System Architecture

The NEWARE Battery Test System has three functional layers. The host computer provides the operator interface and manages test data. The mid-level controller (known as control unit) coordinates communication between the host computer and the test hardware. The battery tester runs the test at the channel level. Depending on the equipment configuration, the mid-level controller may be a separate unit or integrated into the tester.

1.1. Host Computer (Upper Computer)

The host computer is where the operator configures and monitors battery tests. In a typical setup, BTS Client and BTS Server run on the same computer. They can also run on separate computers in a networked setup.

  • BTS Client is the operator interface. Use it to select a test channel, define a test sequence, start or stop a test, and view live measurements and channel status.
  • BTS Server handles communication with the mid-level controller. It forwards commands from BTS Client, receives test data and status updates, and makes those records available for monitoring and later review.

 

1.2. Mid-Level Controller (Control unit & Middle Machine)

The mid-level controller is the communication and control interface between BTS Server and the battery tester. It receives test instructions from BTS Server, directs the connected test hardware, and sends measurements and channel status back to the server. A single controller can manage multiple testers in supported configurations, allowing them to communicate with BTS Server through a shared connection.

 

1.3. Battery Tester (Lower Machine)

The battery tester, also referred to as a battery cycler, contains the physical test channels. Connect the battery under test to the designated channel. The channel carries out the programmed steps, such as charging, discharging, and resting, and measures voltage and current during the test. It reports the measurements and channel status through the mid-level controller so the operator can follow test progress in BTS Client.

2. Hardware Connection

2.1. Hardware Connection for BTS-4000 Series

2.1.1. Connect the Battery Tester to the Control Unit

  • Single tester under control unit:
    Using the supplied network cable, connect an RS-485 port on the battery tester to an RS-485 port on the control unit. This connection carries RS-485 serial communication.
  • Daisy-Chain Multiple testers & Aux units under control unit:

    Each battery tester and auxiliary unit has two RS-485 ports. To connect multiple units to the same control unit:

    1. Connect one RS-485 port on the first unit to an RS-485 port on the control unit.
    2. Connect the remaining RS-485 port on the first unit to either RS-485 port on the next unit.
    3. Repeat this pattern for each additional unit.

    Port identification: The RS-485 and TCP/IP connections both use network cables. Check the port labels before connecting each cable.

2.1.2. Connect the Control Unit to the Host Computer

  • Single control unit: Use an Ethernet cable to connect the TCP/IP port on the control unit directly to the Ethernet port on the host computer.
  • Multiple control units: Use an Ethernet switch to connect multiple control units to the same host computer. Connect the TCP/IP port on each control unit to a separate port on the switch, then connect the host computer’s Ethernet port to another port on the same switch.

2.2. Connect BTS6000, BTS8000, and AIO Systems with an Integrated Control Unit

The NEWARE BTS6000, BTS8000, and AIO series use the same three-layer system architecture as the BTS4000 series. In these models, the control unit (CU) is built into the tester or chamber, and the internal RS‑485 connection between the tester and the CU is connected at the factory.

  • Single device: Use an Ethernet cable to connect the device’s TCP/IP port directly to the Ethernet port on the host computer.
  • Multiple devices: Connect each device’s TCP/IP port to a separate port on an Ethernet switch. Connect the host computer’s Ethernet port to another port on the same switch.

3. Software Installation, Setup, and Connection.

3. 1. Software Download and Installation.

Download BTS 8.0 installation package first. 

Then follow the below instruction for installation.

From here, you should have BTS client and server installed successfully.

3.3. IP Configuration and Device Connection

After connecting the hardware and installing the BTS software, configure the IP addresses so that the control unit (CU) can communicate with BTS Server. Depending on your setup, you may need to change the IPv4 address of the host computer’s Ethernet adapter or the IP settings on the CU.

Each CU is shipped with two factory-configured IP addresses. Both are listed on a label on the side of the CU or, if the CU is integrated, on the side of the device.

LabelMeaning
Local IPThe IP address assigned to the CU itself.
Server IPThe IP address the CU uses to connect to the computer running BTS Server.

A CE-6000, CE-8000, or AIO system may contain more than one CU. For the initial connection, identify the CU you want to connect and locate its factory-default Server IP on the label. Set the IPv4 address of the host computer’s Ethernet adapter connected to the test system to match that Server IP. The CU can then connect to BTS Server at the configured address.

Please refer following instruction to change IPv4 address of your hoster computer.

For BTS6000, BTS8000, and AIO systems, locate the Server IP on the label on the side of the device. To establish the connection, set the IPv4 address of the host computer’s Ethernet adapter connected to the test system to match the Server IP shown on the label.

From here, you should have hoster computer and testing system connected successfully.

The device list and channels should now appear as shown below.

 

4. BTS client basic user guide

Log in to your user account each time you open BTS Client. Most client functions become available only after login. This helps prevent unauthorized users from accidentally starting or stopping the equipment and creating hazardous conditions.

  • Default username — `admin`
  • Default password — `neware`

To start a test, right-click the desired channel and select Single Start.

From here, you could start build steps and start testing.

For detailed instructions on using BTS Client, click the link below to download the user manual.

Download the complete BTS8.0 user manual.