Neware software

5
Jul

Standalone BuildTest application for Neware BTS4000

So many Neware customers are waiting for a standalone test builder which can be used offline(without testers online), now we made it for you.You can use this software to open/view/create/edit the test profiles generated by BTS4000 software. More importantly, you can use it to create pulse test or driving simulation test profies, this is pretty cool, right? And the newest

Read more

3
Jun

How to use Neware tester for Charge capacity recovery after long time under IEC standard

The objective of the test is to identify the leakage current during the storage. In the test, we will check the remaining capacity, it’s better if the remaining capacity is higher. Step 1. Battery charge according to 7.2 charging procedure and test purpose Step 2. Step 4. Step 6 Or we can combine all the steps together.

3
Jun

How to use Neware tester for cycle test under IEC standard

The purpose of this test is to identify the battery’s endurance in cycles. In other word,The test objective is to determine the number of times a battery can be used by evaluating it until it deteriorates after repeated cycles of charging and discharging. The standard is on following picture. It’s quite simple to use Neware battery tester to run the cycle

Read more

21
Mar

Channel in parallel, parallel channels for higher current

Attention: Chanels parallel function can only be made on Neware 5V and 20A or higher testers, such as 5V20A/30A/50A/100A/500A. For all the other testers not 5V or lower than 20A, please don’t use parallel function on them, it might burn the tester. To increase the current for the test purpose, we can put up to maximum 4 channels in parallel.

Read more

21
Mar

Working step color setting

Working step color can be customized, after the setting, the working step will be displayed in the color that user prefers. Right click channel zone, click “Channel Infor”. If you have more questions, please contact me with: collin@newarebattery.com

21
Mar

Working step jump

During the working steps are executing, we can jump from current step to target step directly. 1 Select the testing channels, simply right click“Jump”. 2 There are 2 methods to jump from one step to another.Click the target working step on popup window, it’s in yellow once it was selected,click “Yes”;you can also just simply enter the number of traget

Read more

21
Mar

Channel Information

The channel details can be checked through channel information. The channel details are including: Current channel property, Working step details, current measurement range(dual range), Voltage measurement range, middle machine information, lower machine information, Client version,Server version,etc. Select the channel you want to check, right click “Channel Info” If you have more questions, please contact me with: collin@newarebattery.com

21
Mar

Channel status information

Stopped: Working step haven’t completed, it’s on stop state. Finished: Working step have completed. Protected: It have reached some of protection conditions(Eg Voltage limitation…), channel is under protection, it can click and view the reason. If you have more questions, please contact me with: collin@newarebattery.com

20
Mar

Reset Mapping

To set the mapping operation for the middle machine: In the device list, select the middle machine, right-click in the gray area on the right side of the interface, and click “Reset Mapping”. In the mapping interface, click “server IP (e.g. 127.0.0.1)”, “type of middle machine (e.g. BTS82)”, and double-click “number of the middle machine (e.g. 1)”, the right column

Read more

20
Mar

Query

1.Enter the search conditions of the query, and each search condition is a “logical AND” relationship. Note: “Record Size” is used to limit the number of data displayed at one time, the number in the 1-99999 interval can be included. The “Barcode” of the battery can use fuzzy query. 2.In the search result list, right click on the data, the

Read more